To assemble a curtain from component parts (kit form)
• Use the 30mm long Pan Head screws to secure the stainless steel track to either
the soffit or face of the opening.
• Take a measurement from the top of the track to the floor.
• Subtract 65mm from this measurement, this includes the floor clearance.
• Cut the curtain to this length , it must be cut square to enable the strip to
hang vertically. |
|
|