• Push the sliding track brackets over the sliding track and position at intervals of no more than 1.2 metres.

• Level the track and brackets before securing to brickwork and concrete with rawl-bolts, to steelwork with high tensile nuts & bolts and to timber with coach screws or large gauge wood screws.

• Place the roller assembly over the M8 bolt and tighten into position using the washer and nut.

• Place the rollers no more than 1200mm apart and no more than 200mm in from each end of the track.
 
Now see Step 2