• Push the sliding track brackets over the sliding track and position at intervals
of no more than 1.2 metres.
• Level the track and brackets before securing to brickwork and concrete with rawl-bolts,
to steelwork with high tensile nuts & bolts and to timber with coach screws
or large gauge wood screws.
• Place the roller assembly over the M8 bolt and tighten into position using the
washer and nut.
• Place the rollers no more than 1200mm apart and no more than 200mm in from each
end of the track.
|
|
|