• Slide the M8 bolts into the centre slot and along the track.
• Slide the required number M8 bolts down both sides of the track ready to receive
the curtain strips before sliding onto the track.
• Push each pre drilled strip over the bolts with the concave side facing the track.
• Hold each strip to the track using the aluminium plate, thread the M8 nuts onto
the bolts but do not tighten fully.
• Slide the strip to the desired starting place before tightening the nuts.
• Fix an M8 nut and bolt through the side and at each end of the sliding track
to stop the track from sliding out.
• To achieve 100% overlap
each strip must butt up to the next on both sides of the track, for 50% overlap
each strip should be placed at a distance from each other that it overlaps by a
quarter of the width of each strip. |
|
|